As part of the extensive renovation project of the Olympic Stadium, estimated at 870 million dollars, Solmatech was commissioned to carry out the inspection of the welds.
Welding inspection
The project involves dismantling the existing roof, replacing the technical ring, and installing a new fixed roof with an expected lifespan of 50 years. Our scope of work includes visual inspections, as well as magnetic particle and ultrasonic testing to ensure the integrity and safety of the welds.